Excavator, over 6 tonnes
Your first-day checklist
Print it and keep it with the machine.
On delivery
- Walk around it BEFORE you sign
- Cab structure and glazing
- Ask for the machine’s logbook and documents
- ENGINE manual (separate document)
Unloading
- NOBODY in the area — move people away, don’t just wave them back
- Firm, level, clear ground
- Ramps rated for the weight, secured to the bed
- Slew lock on, attachment tucked in and low
- If lifting: only the marked lifting points
Before the first start
- All fluid levels, machine on level ground
- Safety lever, emergency exit, extinguisher
- Grease points on the slew ring
- Track tension
First start
- Short bursts
- About 5 min at idle — larger oil volumes
- Dry run, nobody around
- ISO or SAE pattern checked
Break-in
- First 50 hours taken gently
- First oil change well before the normal interval
What kills
- The counterweight sweeps at head height
- Cordon off the working area, don’t just signpost it
- Buried services: the machine will not feel a thing
Never do this
- Never use ether or a starting aid spray
- Never correct your line while on the ramps
- Never jack the machine up on its boom to load it
- Never slew without having looked behind you