Telehandler
Your first-day checklist
Print it and keep it with the machine.
On delivery
- Walk around it BEFORE you sign
- LOAD CHART present, legible, and the one for YOUR attachment
- Manual, log book and inspection report requested
- Forks, carriage, attachment lock all checked
Unloading
- Firm level ground, well clear of edges
- Never correct your steering on the ramp
- Boom retracted and low, forks just off the ground
- Once loaded: chock and lash down
Before the first start
- All fluid levels, machine on level ground
- Tyres: pressure and condition — they carry everything
- Frame levelling rams and stabilisers
- Belt, mirrors, alarm
Before lifting
- FRAME LEVEL — 0° — before the boom goes up
- Read the chart for the reach AND height you are aiming at
- Ground that bears, under wheels or stabilisers
- Power lines located before lifting
What tips it
- Capacity FALLS as the boom extends
- An unlisted attachment = the wrong chart
- Driving with the boom raised: forbidden
- Levelling the frame with the load in the air
Regulatory frame
- CACES R482 category F (rough-terrain handlers)
- The authorisation to operate comes from the employer
- Periodic inspections according to use
- Lifting people: only in an approved work platform
Never do this
- Never lift without the chart for YOUR attachment on board
- Never lift if the frame is not level
- Never drive with the boom raised
- Never level the frame with the load up high
- Never raise anyone on forks or a pallet