Servicing the RB06

The reading shown on the dashboard

RB06
Brand
Rippa
Machine type
Backhoe loader
Engine
Kubota D1105
No manufacturer schedule for this model: here is the one for its machine type.

At 100 h on the meter, across 21 tracked service points.

Where you stand

  1. 50 h1 point
  2. 100 h5 points
  3. 100 hYou are here

Plus 5 actions to repeat at every use.

  • Check the engine oil level — every 10 h
  • Check the hydraulic oil level — every 10 h
  • Check the coolant level — every 10 h
  • Grease the boom and arm pins — every 10 h
  • Grease the bucket pins — every 10 h

Already due 1

Replace the engine oil filter

Already due

Was expected around 50 h

Kubota keeps this interval. prescribes 250 h for this engine — we keep the shorter one.

Due now 10

Check the engine oil level

Due now

Due now — at 100 h

Check the hydraulic oil level

Due now

Due now — at 100 h

Check the coolant level

Due now

Due now — at 100 h

Grease the boom and arm pins

Due now

Due now — at 100 h

  • Graisse NLGI 2
  • × 8
Where and how

How

  1. Lower the attachment to the ground, stop the engine and remove the key.
  2. Wipe each nipple before fitting the gun: otherwise you inject the grit along with the grease.
  3. Pump until a small bead of clean grease appears at the joint.
  4. Wipe off the excess: grease left proud collects grit and does the opposite of what you want.

Grease the bucket pins

Due now

Due now — at 100 h

  • Graisse NLGI 2
  • × 4
Where and how

How

  1. Rest the bucket flat on the ground, stop the engine and remove the key.
  2. Wipe each nipple before fitting the gun.
  3. Pump until clean grease appears, then wipe off the excess.

Check the battery electrolyte

Due now

Due now — at 100 h

Drain water from the fuel system

Due now

Due now — at 100 h

Check the hydraulic hoses

Due now

Due now — at 100 h

Check and adjust the fan belt

Due now

Due now — at 100 h

Kubota keeps this interval. prescribes 200 h for this engine — we keep the shorter one.

Clean the air filter

Due now

Due now — at 100 h

Kubota keeps this interval. prescribes 200 h for this engine — we keep the shorter one.

Calendar-based

  • Replace the radiator hoses every 24 months
  • Replace the coolant every 24 months
Indicative information only. The manufacturer's manual is what counts.

A year of servicing

23 scheduled jobs

Plus 5 actions to repeat at every use.

Products to keep in stock

  • Graisse NLGI 2
  • ISO VG 46 (HV)

We put no price on this: the reference knows the products, not the quantities. Price them yourself with your own supplier.

Reviews

Nobody has written here yet.

Write a reviewEvery review is read by a person before it goes live.