Servicing the RF30

The reading shown on the dashboard

RF30
Brand
Rippa
Machine type
Forklift
Engine
Kubota V2403
No manufacturer schedule for this model: here is the one for its machine type.

At 100 h on the meter, across 24 tracked service points.

Where you stand

  1. 50 h1 point
  2. 100 h10 points
  3. 100 hYou are here

Plus 3 actions to repeat at every use.

  • Check the engine oil level — every 10 h
  • Check the coolant level — every 10 h
  • Check the hydraulic oil level — every 10 h

Already due 1

Replace the engine oil filter

Already due

Was expected around 50 h

Kubota keeps this interval. prescribes 250 h for this engine — we keep the shorter one.

Due now 13

Inspect the forks

Due now

Due now — at 100 h

Cracks, bending, heel wear: a cracked fork gives way without warning, under load.

  • × 2

Inspect the lift chains

Due now

Due now — at 100 h

Equal tension on both runs, cracked links, elongation. A chain stretched by 3% is replaced.

Grease the mast and slide pads

Due now

Due now — at 100 h

Rails, rollers and mast pads: this is what makes the lift smooth and quiet.

  • Graisse NLGI 2

Check the tyres

Due now

Due now — at 100 h

Pressure, cuts, uneven wear. An under-inflated tyre shifts the load and tires the axle.

  • × 4

Check the brakes

Due now

Due now — at 100 h

Pedal travel, parking brake, fluid level. Empty as well as loaded.

Check the engine oil level

Due now

Due now — at 100 h

Check the coolant level

Due now

Due now — at 100 h

Check the hydraulic oil level

Due now

Due now — at 100 h

Check the battery electrolyte

Due now

Due now — at 100 h

Drain water from the fuel system

Due now

Due now — at 100 h

Check the hydraulic hoses

Due now

Due now — at 100 h

Clean the air filter

Due now

Due now — at 100 h

Kubota keeps this interval. prescribes 200 h for this engine — we keep the shorter one.

Check and adjust the fan belt

Due now

Due now — at 100 h

Kubota keeps this interval. prescribes 200 h for this engine — we keep the shorter one.

Calendar-based

  • Replace the radiator hoses every 24 months
  • Replace the coolant every 24 months
Indicative information only. The manufacturer's manual is what counts.

A year of servicing

39 scheduled jobs

Plus 3 actions to repeat at every use.

Products to keep in stock

  • Graisse NLGI 2
  • ISO VG 46 (HV)

We put no price on this: the reference knows the products, not the quantities. Price them yourself with your own supplier.

Reviews

Nobody has written here yet.

Write a reviewEvery review is read by a person before it goes live.